18 Years Factory Metal Storage Racks - Warehouse Storage Steel Platform Manufacturer – Spieth
18 Years Factory Metal Storage Racks - Warehouse Storage Steel Platform Manufacturer – Spieth Detail:
The Steel Platform column spacing is usually within 4-6m, the first floor is about 3m high, and the second and third floors are about 2.5m high.
The columns are usually made of square or round pipes. The main and add-on beams are usually made of H-shaped steel.
Using Cold-rolled steel floor slabs, the loading capacity is usually within 1000kg per square meter. The steel platform structure allows the closest combination of storage and management, and can be used as a warehouse office upstairs or downstairs. Such systems are mostly used in logistics and machinery industries.
Material | Cold Rolled Steel Q235 |
Structure | Post, Main Beam, Sub Beam, Steel Floor, Staircase, Handrail |
Size | OEM and Free Design |
Loading Capacity | 200-1000kg/m² |
Surface Treatment | High Quality Powder Coating Finish |
Product detail pictures:
Related Product Guide:
We've been commitment to offer the competitive rate ,outstanding merchandise good quality, too as fast delivery for 18 Years Factory Metal Storage Racks - Warehouse Storage Steel Platform Manufacturer – Spieth , The product will supply to all over the world, such as: Denver , Naples , Amsterdam , We have customers from more than 20 countries and our reputation has been recognized by our esteemed customers. Never-ending improvement and striving for 0% deficiency are our two main quality policies. Should you need anything, don't hesitate to contact us.
By Madge from Sacramento - 2017.08.18 18:38
A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
By Ivy from Ecuador - 2018.06.18 19:26
Write your message here and send it to us